Crosslay Packaging - Speed Loads
- Conway Fire
- Feb 16, 2017
- 1 min read
In an earlier post, we were discussing the triple loads on Engine 1. We now have a more detailed description of the procedure for packaging the crosslays in the speed load boxes. This demonstration is with the white line, so keep in mind that the important thing is that the hose is deployed on the same side as the discharge connection whenever possible to minimize the length of hose that is taken out of play, as the distance of the opposite discharge to the end of the box takes approximately 4 feet of the hose. If you have any questions or comments, you may enter them below.